Parts III and IV

Parts I-IV Response to First Technical Notice Of Deficiency

REDLINE VERSIONS

Parts I-IV Response to Second Technical Notice Of Deficiency

Parts I-IV Clarification To Second Technical Notice of Deficiency

Technically Complete Documents — March 11, 2016

Second Supplement to Technically Complete Application dated October 5, 2016

Third Supplement to Technically Complete Application dated November 8, 2016

Fourth Supplement to Technically Complete Application dated January 11, 2017

Fifth Supplement to Technically Complete Application dated August 15, 2017

Transmittal Letter, Part 1 Form and Table of Contents
Part II  
Part III
Part III A Site Development Plan
Part III B.0 General Facility Design
Part III B.1 Facility Design Drawings
III C.1 Drainage Report
III C.2 Drainage Drawings
III C.3 Drainage Analysis
III C.4 HydroCAD Output
III C.5 Erosion Control Plan
III D.0 WMU Design
III D.1 Site Layout
III D.2 Cross Sections
III D.3 Design Drawings
III D.4 Site Life
III D.5.0 Geotechnical Analysis
III D.5.1 Geotechnical Design Parameters
III D.5.2 Slope Stability Analyses
III D.5.3 Foundation Bearing Capacity Analyses
III D.5.4 Settlement and Soil Liner Strain Analyses
III D.6.0 Leachate and Contaminated Water Plan
III D.6.0-A Leachate and Contaminated Water Plan Design Analysis
III D.6.0-B HELP Model Outputs
III D.8.0 Alternative Final Cover Demonstration
III D.8.1 HELP Outputs
III E.0 Geology Report
III F.0 Groundwater Monitoring Plan
III F.1 Groundwater Monitoring Drawings
III G.0 Landfill Gas Management Plan
III G.1 Landfill Gas Management Plan Drawings
III H Closure Plan
III J Cost Estimates for Closure Plan

REDLINE VERSIONS

Part II – Redline Version
Part III – Redline Version
Part III A Site Development Plan – Redline Version
Part III B.0 General Facility Design – Redline Version
Part III B.1 Facility Design Drawings – Redline Version
III C.1 Drainage Report – Redline Version
III C.2 Drainage Drawings – Redline Version
III C.3 Drainage Analysis – Redline Version
III C.4 HydroCAD Output – Redline Version
III C.5 Erosion Control Plan – Redline Version
III D.0 WMU Design – Redline Version
III D.1 Site Layout – Redline Version
III D.2 Cross Sections – Redline Version
III D.3 Design Drawings – Redline Version
III D.4 Site Life – Redline Version
III D.5.0 Geotechnical Analysis – Redline Version
III D.5.1 Geotechnical Design Parameters – Redline Version
III D.5.2 Slope Stability Analyses – Redline Version
III D.5.3 Foundation Bearing Capacity Analyses – Redline Version
III D.5.4 Settlement and Soil Liner Strain Analyses – Redline Version
III D.6.0 Leachate and Contaminated Water Plan – Redline Version
III D.6.0-A Leachate and Contaminated Water Plan Design Analysis – Redline Version
III D.6.0-B HELP Model Outputs – Redline Version
III D.8.0 Alternative Final Cover Demonstration – Redline Version
III D.8.1 HELP Outputs – Redline Version
III E.0 Geology Report – Redline Version
III F.0 Groundwater Monitoring Plan – Redline Version
III F.1 Groundwater Monitoring Drawings – Redline Version
III G.0 Landfill Gas Management Plan – Redline Version
III G.1 Landfill Gas Management Plan Drawings – Redline Version
III H Closure Plan – Redline Version
III J Cost Estimates for Closure Plan – Redline Version

Parts I-IV Response to First Notice Of Deficiency to Fifth Supplement to Technically Complete Application

Sixth Supplement to Technically Complete Application dated December 1, 2017